Fulton Industrial Boulevard/Cascade Road/Camp Creek Streetscapes

Project Overview

Primary and Secondary District Gateway Enhancements

The original Fulton Industrial Master Plan identified the Camp Creek Parkway and Cascade Road intersections with Fulton Industrial Boulevard as primary and secondary gateways into the district. Additionally, stakeholders identified the enhancement of these gateways with both operational and streetscape improvements as a top priority for the CID. Following GDOT’s operational improvements to the Camp Creek Parkway/Fulton Industrial Boulevard intersection in 2017 as part of an SR 6 multi-intersection improvement project in Douglas, Cobb and Fulton Counties, the CID began the process of tackling operational improvements at the Cascade Road/Fulton Industrial Boulevard intersection and streetscape enhancements throughout that intersection and surrounding areas, including the Camp Creek Parkway/Fulton Industrial Boulevard intersection.

The project includes safety and operational upgrades to the Cascade Road/Fulton Industrial Boulevard intersection that will improve access to and allow for safer travel through the entire district for both passenger and commercial vehicles. Additionally, the project includes new landscaping, sidewalks, streetlights, enhanced pedestrian safety crosswalks and islands, gateway signage, and public art.

Project Funding

In 2019, the CID committed $455,000 toward design and engineering, and in early 2021, the Atlanta Regional Commission (ARC) awarded $2.8 million toward the project. Another $1 million in TSPOLST funds from Fulton County is allocated to the project.

Project Timeline

Fall 2018

Design and Engineering RFP Issued

Scheduled to be completed in 2025

Design and Engineering

Summer 2026

Construction Expected to Begin